In scorecard setups, there are some compulsory elements that may need a slightly different regression calculation to the standard regression line, e.g. maybe a higher target before the calculation kicks in etc.
In these instances, you can now opt to allow an override regression on compulsory content, from the section set up.
This then allows you to firstly see the current default regression in the compulsory content set up screen and opt to override it. (Regression % points become editable when you opt to override them).
In the individual’s performance plan you can see the difference between the results based on the regression line each item is using. Only the last item is using an overridden regression different to the default.
If you are interested in scorecards in your performance plan, please talk to your Project Lead for more information.